Team SHUNYAIIT BOMBAY

THE ENGINEERING PORTFOLIO

15 projects.
Each began as a question.

Three full-scale houses, four design proposals, cooling prototypes, field studies and digital tools, all made by IIT Bombay students.

01 / FULL-SCALE

Houses you can walk into.

Students and guests gather outside Vivaan at IIT Bombay.
2023 · BUILT HOUSE

Vivaan

How do you keep a Mumbai home comfortable through heat and humidity?

A two-storey solar house on the IIT Bombay campus brings coastal humidity, electricity and water into one design.

Recognition
Second place overall at the 2023 US Solar Decathlon Build Challenge.
Category
Buildings & retrofits
Record
22 photographs · 3D model
  • Trophies and team photographs from Vivaan’s second-place finish at the 2023 US Solar Decathlon Build Challenge.Trophies and team photographs from Vivaan’s second-place finish at…
  • The jaali screen detail.The jaali screen detail.
  • The installed photovoltaic array on Vivaan’s roof.The installed photovoltaic array on Vivaan’s roof.
Solarise at dusk. Light from the completed home picks out the frame and screens.
2018 · BUILT HOUSE

Solarise

How can a house travel in parts and still work as one building?

A two-storey modular solar house built for the 2018 Solar Decathlon in Dezhou, China.

Recognition
Received the Best Participation Award at Solar Decathlon China 2018.
Category
Buildings & retrofits
Record
11 photographs
  • Students work among steel columns and roof members.Students work among steel columns and roof members.
  • The team fits out a partition inside the house.The team fits out a partition inside the house.
  • The illuminated frame at night during construction.The illuminated frame at night during construction.
H-Naught, the house entered in Solar Decathlon Europe 2014.
2014 · BUILT HOUSE

H-Naught

Where can a small home put waste heat to work?

A single-storey prefabricated solar house combined modular construction with heat recovery.

Recognition
Honourable Mention for Sustainability at Solar Decathlon Europe 2014, Versailles, France.
Category
Buildings & retrofits
Record
8 photographs
  • Interior fit-out during the build.Interior fit-out during the build.
  • Students assemble a framed panel at the build site.Students assemble a framed panel at the build site.
  • Team members inside the furnished house during the build.Team members inside the furnished house during the build.
02 / ON PAPER, TO BUILD

Design proposals.

Buildings designed for real Indian contexts and judged against international entries.

03 / ON THE BENCH

Cooling prototypes.

Mumbai needs comfort that handles heat and humidity. These are the devices we built and tested to find out how.

04 / MEASURED AND MODELLED

Tools and studies.

Software and measurement work that comes out of the houses: a design assistant, an event carbon tool and a sensor-based study inside Vivaan.

  1. Nivas EcoTechMVP under development
    01 · 2025–26

    Nivas EcoTech

    A design assistant for Indian homes. Answer plain questions about your plot, rooms and climate, and get a sourced, buildable passive-design report before you build.

    Open project →
  2. Carbon CalculatorEvent accounting tool
    02 · 2024–25

    Carbon Calculator

    A calculator helps campus organisers estimate the emissions associated with an event.

    Open project →
  3. Vivaan Digital TwinResearch in development
    03 · 2026

    Vivaan Digital Twin

    Inside Vivaan, students compare readings from five positions with a room model to study temperature, humidity, air movement and light.

    Open project →